Sunday, March 1, 2009
I really have been doing something even though I haven't posted pictures.
In my workshop area, I now have the filtration system up and running. Well when I need it it'll be able to run. ;o)
As I'd said, I have all the drywall hung, except for one small piece on the back side of the front of the shower. You'll also notice I have the lights up over where the sink will sit and the one in the shower. I still have to install the vent/light out from the shower/ stool area. I'll be installing the stool next Monday as that's when I'll be taking the one out of our friends house.
This shot shows the drywall hung on the wall facing the workshop area. I also have the closet light installed in the larger bedroom so all lighting is now installed in both bedrooms. Oops! I almost forgot to mention I also have the fire alarms installed in both bedrooms.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment