I finished cutting, at least the first two levels, the trees along the drive to open up the apple trees. This shot is from the bend in the drive looking up.
This photo is taken looking the other way.
I then went back into the basement. We have drywalled the stairwell. And removed the handrail that was on the right.
I now have the outside corners on in the smaller bedroom.
I have the closets fully drywalled and mudded, complete with corners.
This of course, as there is plumbing, is the bathroom. I have yet to get the shower walls installed and all drywall, electrical, and plumbing completed. Plus there isn't any fixtures in there yet either.